©2016 Alpine-Service
Projects 2015
3CLF__002_15
Fxed-grip 3-seater chairlift from the manufacturerLeitner including dismantling and loading in the Ski Area Kalcheralm/Ratschings (Italien)
technical specifications rope way type 3-CLF manufacturer Leitner construction year 1993 inclined length 920,00 m height difference 190,00 m total pillars 12 n° direction of rotation clockwise diameter conveyor rope ø 34 mm transport capacity 1.789 P/H speed 2,3 meters/Sec. chair 3 persons number of vehicles 135 n° drive system mountain station bracing valley station drive type electric
©2016 Alpine-Service
1 SL_005_15
Surface lift system from the manufacturer Doppelmayr including dismantling and loading in the Ski Area Nassfeld (Österreich)
technical specifications ropeway type 2-SL manufacturer Doppelmayr construction year 1991 iclined length 1.090,16 m height difference 332,39 m total pillars 10 n° direction of rotation clockwise diameter conveyor rope ø 22 mm transport capacity 1.220 P/H speed 3,25 meter/sec. numberof hangers 122 n° drive system valley station bracing valley station drive type electric surface lift type CPF 800 EM
r-Service
1 SL_006_15
Surface lift system from the manufacturer Doppelmayr including dismantling and loading - Ski Area Nassfeld (Österreich)
technical specifications ropeway type 2-SL manufacturer Doppelmayr construction year 1981 inclined length 776,14 m height difference 205,29 m total pillars 8 n° direction of rotation counterclockwise diameter conveyor rope ø 22 mm transport capacity 1.440 P/H speed 3,25 meter/sec. number of hangers 105 n° drive system valley station bracing mountain station drive type electric drive power 132 kW
Designed by Chepassa Webdesign © 2014 Alpin-Service
©2016 Alpine-Service